Turnkey Industrial Installation & Commissioning Services
Field-tested mechanical erection, precision electrical panel alignment, VFD/PLC calibration, and statutory Site Acceptance Testing (SAT) for manufacturing plants and utilities across South India.
Direct Engineering Desk
Connect with our commissioning lead engineers for immediate project scheduling and scope review.
From Foundation Plinths to Full-Load Energization
We bridge the gap between OEM shipment and commercial production with rigorous mechanical erection, electrical cabling, parameter tuning, and pre-commissioning safety checks.
Switchgear & Panel Commissioning
Complete on-site erection, busbar torque verification, breaker timing tests, CT/PT polarity verification, and relay calibration for PCC, MCC, and APFC panels.
- Air Circuit Breaker (ACB) & VCB contact timing
- Numerical protection relay curve testing
- 1000V/5000V insulation resistance (Megger) profiling
VFDs, Soft Starters & Motors
Motor-drive parameterization, rotational direction verification, acceleration/deceleration tuning, harmonic line reactors, and no-load & full-load current balancing.
- Motor rotational phase sequence confirmation
- VFD auto-tuning & carrier frequency optimization
- Torque limits & thermal overload setup
Mechanical Rigging & Laser Alignment
Precision leveling, base plate grouting, vibration dampening isolator installation, and laser shaft alignment for coupled motors, compressors, and pumps.
- Dual-axis laser coupling & pulley alignment
- Calibrated torque wrench bolt tightening
- Baseline vibration velocity & acceleration checks
Compressors, Chillers & Utilities
Integration of rotary screw air compressors, refrigerated dryers, industrial process chillers, cooling towers, and circulation water piping manifolds.
- Pneumatic pressure drop testing & leak detection
- Refrigerant suction/discharge pressure verification
- Chilled water balancing & delta-T validation
Instrumentation & Loop Checks
End-to-end signal validation from field sensors (pressure transmitters, RTDs, ultrasonic flow meters) through marshalling cabinets to PLC I/O cards.
- 4-20mA loop current injection & zero/span calibration
- Field control valve pneumatic stroke timing
- SCADA/HMI alarm threshold & tag validation
Site Acceptance Testing (SAT)
Formally structured SAT execution against plant design specifications, statutory CEIG compliance verification, and client engineering sign-off.
- Safety interlock & emergency stop trip verification
- Thermal imaging (thermography) on busbars & terminals
- Comprehensive commissioning certificate dossier
Pre-Commissioning Test Procedures & Tolerances
Stringent verification benchmarks executed prior to energization and production runs.
| Equipment Category | Test & Inspection Protocol | Testing Instrumentation | Compliance Standard | Handover Report |
|---|---|---|---|---|
| Main LT Switchboards (PCC/MCC) | Insulation resistance, High voltage withstand, Contact resistance | 5kV Digital Megger, Micro-ohmmeter, Secondary Injection Kit | IEC 61439-1 / IS 8623 | Panel Insulation & Relay Trip Certificate |
| Induction Motors & Starters | Winding resistance, Phase balance, Locked rotor & No-load current | Digital Milliohm Meter, True RMS Clamp Meter, Tachometer | IS 325 / IS 12615 | Motor Baseline Commissioning Sheet |
| Coupled Rotary Equipment | Angular & parallel shaft alignment, Soft foot correction | Dual-Sensor Laser Alignment Kit, Dial Gauges | ISO 10816 Vibration Severity | Laser Alignment Graphic Certificate |
| VFDs & Motion Controls | Bus voltage ripple, Output waveform, Acceleration torque curve | Industrial ScopeMeter, Infrared Thermal Camera | IEEE 519 Harmonic Norms | VFD Parameter Backup & Thermal Scan |
| Process Instrumentation | Loop calibration (0%, 25%, 50%, 75%, 100% span) | Fluke Process Calibrator, Dry Block Temperature Wells | ISA Standards / NIST Traceable | Transmitter 5-Point Calibration Log |
| Air Compressors & Dryers | Cut-in/cut-out pressure, Dew point sensor check, Leak audit | Digital Manometer, Chilled Mirror Hygrometer | ISO 8573 Compressed Air Class | Pneumatic Stability & Dew Point Record |
Our 5-Stage Commissioning Lifecycle
A proven milestone-based methodology ensuring zero safety incidents and rapid ramp-up to target output.
Mechanical & Civil Integrity
Base leveling, anchor grouting, alignment tolerances, ducting connections, and physical enclosure ingress sealing (IP54/65).
Cold Electrical Verification
Busbar torque tightening, continuity, wire tagging audits, insulation resistance checks, and control loop verification while de-energized.
Dry Run & Energization
First power-on under no-load conditions. Rotation checks, control logic verification, E-stop circuit activation, and relay trip tests.
Wet Run & Load Tuning
Full-load production trials. Monitoring running currents, vibration spectrum, heat dissipation, and PID temperature/speed control stability.
Handover & SAT Dossier
Final sign-off documentation, parameter backup files, maintenance checklist handover, and operational training for client technicians.
Frequently Asked Questions
Detailed technical information about our commissioning protocols, tools, and warranties.
Planning Equipment Installation or Plant Machinery Startup?
Share your equipment schedule, machine specifications, or site layout. Our commissioning engineers will provide a structured commissioning plan, tool list, and fixed commercial quote.