Supply Desk 9390021173
Get a Quote
Skip to content
Certified Field Engineering & Site Commissioning

Turnkey Industrial Installation & Commissioning Services

Field-tested mechanical erection, precision electrical panel alignment, VFD/PLC calibration, and statutory Site Acceptance Testing (SAT) for manufacturing plants and utilities across South India.

HT / LT Calibrated Panels, VCBs & Busducts
Laser Alignment Motors, Pumps & Drives
FAT & SAT Ready Complete Handover Dockets
Zero-Delay Startup Round-the-Clock Teams
Site Commissioning Coordination

Direct Engineering Desk

Connect with our commissioning lead engineers for immediate project scheduling and scope review.

Commissioning & Site Execution
Mr. S. Siva Sankar
+91 9492829072
Technical Support & Scheduling
Mr. Sai Teja
+91 9390021173
Project Documentation Desk
FAT / SAT Inquiries
sales@thibstas.com
Submit Equipment Scope & Schedule →
Comprehensive Commissioning Services

From Foundation Plinths to Full-Load Energization

We bridge the gap between OEM shipment and commercial production with rigorous mechanical erection, electrical cabling, parameter tuning, and pre-commissioning safety checks.

Switchgear & Panel Commissioning

Complete on-site erection, busbar torque verification, breaker timing tests, CT/PT polarity verification, and relay calibration for PCC, MCC, and APFC panels.

  • Air Circuit Breaker (ACB) & VCB contact timing
  • Numerical protection relay curve testing
  • 1000V/5000V insulation resistance (Megger) profiling

VFDs, Soft Starters & Motors

Motor-drive parameterization, rotational direction verification, acceleration/deceleration tuning, harmonic line reactors, and no-load & full-load current balancing.

  • Motor rotational phase sequence confirmation
  • VFD auto-tuning & carrier frequency optimization
  • Torque limits & thermal overload setup

Mechanical Rigging & Laser Alignment

Precision leveling, base plate grouting, vibration dampening isolator installation, and laser shaft alignment for coupled motors, compressors, and pumps.

  • Dual-axis laser coupling & pulley alignment
  • Calibrated torque wrench bolt tightening
  • Baseline vibration velocity & acceleration checks

Compressors, Chillers & Utilities

Integration of rotary screw air compressors, refrigerated dryers, industrial process chillers, cooling towers, and circulation water piping manifolds.

  • Pneumatic pressure drop testing & leak detection
  • Refrigerant suction/discharge pressure verification
  • Chilled water balancing & delta-T validation

Instrumentation & Loop Checks

End-to-end signal validation from field sensors (pressure transmitters, RTDs, ultrasonic flow meters) through marshalling cabinets to PLC I/O cards.

  • 4-20mA loop current injection & zero/span calibration
  • Field control valve pneumatic stroke timing
  • SCADA/HMI alarm threshold & tag validation

Site Acceptance Testing (SAT)

Formally structured SAT execution against plant design specifications, statutory CEIG compliance verification, and client engineering sign-off.

  • Safety interlock & emergency stop trip verification
  • Thermal imaging (thermography) on busbars & terminals
  • Comprehensive commissioning certificate dossier
Standardized Verification Protocol

Pre-Commissioning Test Procedures & Tolerances

Stringent verification benchmarks executed prior to energization and production runs.

Equipment CategoryTest & Inspection ProtocolTesting InstrumentationCompliance StandardHandover Report
Main LT Switchboards (PCC/MCC)Insulation resistance, High voltage withstand, Contact resistance5kV Digital Megger, Micro-ohmmeter, Secondary Injection KitIEC 61439-1 / IS 8623Panel Insulation & Relay Trip Certificate
Induction Motors & StartersWinding resistance, Phase balance, Locked rotor & No-load currentDigital Milliohm Meter, True RMS Clamp Meter, TachometerIS 325 / IS 12615Motor Baseline Commissioning Sheet
Coupled Rotary EquipmentAngular & parallel shaft alignment, Soft foot correctionDual-Sensor Laser Alignment Kit, Dial GaugesISO 10816 Vibration SeverityLaser Alignment Graphic Certificate
VFDs & Motion ControlsBus voltage ripple, Output waveform, Acceleration torque curveIndustrial ScopeMeter, Infrared Thermal CameraIEEE 519 Harmonic NormsVFD Parameter Backup & Thermal Scan
Process InstrumentationLoop calibration (0%, 25%, 50%, 75%, 100% span)Fluke Process Calibrator, Dry Block Temperature WellsISA Standards / NIST TraceableTransmitter 5-Point Calibration Log
Air Compressors & DryersCut-in/cut-out pressure, Dew point sensor check, Leak auditDigital Manometer, Chilled Mirror HygrometerISO 8573 Compressed Air ClassPneumatic Stability & Dew Point Record
Systematic Execution Protocol

Our 5-Stage Commissioning Lifecycle

A proven milestone-based methodology ensuring zero safety incidents and rapid ramp-up to target output.

01

Mechanical & Civil Integrity

Base leveling, anchor grouting, alignment tolerances, ducting connections, and physical enclosure ingress sealing (IP54/65).

02

Cold Electrical Verification

Busbar torque tightening, continuity, wire tagging audits, insulation resistance checks, and control loop verification while de-energized.

03

Dry Run & Energization

First power-on under no-load conditions. Rotation checks, control logic verification, E-stop circuit activation, and relay trip tests.

04

Wet Run & Load Tuning

Full-load production trials. Monitoring running currents, vibration spectrum, heat dissipation, and PID temperature/speed control stability.

05

Handover & SAT Dossier

Final sign-off documentation, parameter backup files, maintenance checklist handover, and operational training for client technicians.

Technical & Site Inquiries

Frequently Asked Questions

Detailed technical information about our commissioning protocols, tools, and warranties.

Can you commission equipment supplied by third-party OEMs or imported machinery? +
Yes. Our field engineering teams routinely install, wire, and commission equipment sourced from global and domestic manufacturers. We work strictly in adherence with OEM installation guidelines to preserve manufacturer warranty terms while ensuring compliance with Indian electrical norms.
What is the difference between FAT and SAT support provided by Thibstas Industrial? +
Factory Acceptance Testing (FAT) validates panel and equipment functionality at the manufacturing plant before shipping. Site Acceptance Testing (SAT) takes place after site erection, verifying real-world supply voltages, field cable connections, motor load trials, safety interlocks, and operational stability under live plant conditions.
How do you ensure zero vibration and precision shaft alignment for rotary equipment? +
We utilize dual-sensor precision laser alignment systems, magnetic dial indicators, and calibrated torque wrenches for motor-to-pump, compressor, and gearbox couplings, verifying runout tolerances within ISO 10816 vibration severity standards.
Do your engineers handle PLC program uploading and VFD parameter tuning during startup? +
Yes. Our automation field engineers handle VFD motor parameter auto-tuning, acceleration/deceleration profiles, communication bus setup (Modbus, Profibus, Profinet, Ethernet/IP), and I/O point-to-point loop checks against electrical schematics.
What documentation is delivered upon commissioning sign-off? +
We provide a complete SAT Commissioning Dossier including: pre-commissioning cold/hot test sheets, relay calibration reports, megger logs, thermography baseline images, VFD parameter backup files, and signed handover sign-offs for statutory records.

Planning Equipment Installation or Plant Machinery Startup?

Share your equipment schedule, machine specifications, or site layout. Our commissioning engineers will provide a structured commissioning plan, tool list, and fixed commercial quote.

Direct Commissioning Lead: +91 9492829072 (Mr. Siva Sankar) | Supply Desk: +91 9390021173