Supply Desk 9390021173
Get a Quote
Skip to content
Greenfield & Brownfield Factory Setup Engineering

Turnkey Industrial Plant Setup Support

From initial connected load calculations and 11kV/33kV substation erection to main power control centers, overhead busducts, utility air piping, machine cabling, and statutory CEIG approvals—delivering operational factories on schedule.

Greenfield & Brownfield Turnkey Electrical & Utility
Substation to Drop 11kV/33kV down to Machine SDB
Statutory Clearances Turnkey CEIG & DISH Liaison
Guaranteed Milestones Synchronized with Civil Handover
Direct Plant Project Coordination

New Plant Setup Desk

Connect with our senior turnkey project engineers for site layout and load schedule review.

Turnkey Projects Lead
Mr. S. Siva Sankar
+91 9492829072
General Plant Inquiries
Mr. Sai Teja
+91 9390021173
Project Engineering Email
Submit Site Layout / SLD
sales@thibstas.com
Submit Plant Layout for Feasibility →
Comprehensive Turnkey Scope

End-to-End Infrastructure for New & Expanding Plants

We bridge the gap between civil factory buildings and live machine production, executing all electrical, utility, earthing, and statutory milestones under single-point accountability.

HT Substation & Power Ingress

Connected load calculations, utility DISCOM power sanction liaison, 11kV/33kV indoor and outdoor substation erection, power transformers, and HT metering kiosk setups.

  • Connected load scheduling & diversity optimization
  • Transformer plinth installation & oil BDV testing
  • HT vacuum circuit breaker (VCB) synchronization

Main LT Switchboards & Busducts

Main Power Control Center (PCC) erection, DG synchronization AMF panels, APFC capacitor banks for power factor maintenance, and overhead sandwich busbar trunking systems.

  • Main switchboard erection up to 6300A
  • Aluminium & copper sandwich busway installation
  • Auto-mains failure (AMF) dual power changeovers

Machine Drops & Bay Distribution

Overhead heavy-duty GI cable ladder trays, machine-level sub-distribution boards (SDB), localized rotary isolators, and final power terminations to production machinery.

  • Dedicated machine drops with individual isolators
  • Armoured power & shielded control cable laying
  • Numbered ferrule tagging & loop continuity testing

Plant Compressed Air & Utility Piping

Layout and erection of the central utility room: rotary screw air compressors, refrigerated air dryers, zero-loss condensate drains, and overhead aluminum pneumatic ring mains.

  • Aluminum modular compressed air piping networks
  • Process cooling water supply & return manifolds
  • Pneumatic pressure drop testing & leak validation

Earthing Grids & Industrial Illumination

Chemical maintenance-free earthing rings (< 1.0 Ohm), ESE lightning arresters, plant-wide high-bay LED illumination, emergency exit lighting, and perimeter floodlights.

  • Substation & electronic clean earthing grids
  • Lux calculations compliant with factory floor norms
  • Automatic lighting distribution boards with timer relays

Statutory CEIG Approvals & Energization

Complete regulatory clearance package: CAD drawing submission, relay test certificates, earth pit logs, inspectorate site escorting, and pre-commissioning safety approvals.

  • As-Built Single Line Diagram (SLD) CAD sign-off
  • CEIG site inspection coordination & punch-list closure
  • Official power energization permission certificate
Turnkey Project Matrix

Plant Setup Scope & Quality Benchmarks

Stringent standards applied across every engineering phase of the new facility setup.

Plant Setup PackageTechnical Engineering ScopeGoverning Codes & StandardsTesting & Commissioning ProtocolKey Deliverable
HT Ingress & Substation11kV / 33kV Substation, Transformers up to 5MVAIS 2026 / CEA Regs 2010Oil BDV test, Ratio & Winding resistance, VCB timingCEIG Approval Certificate
Main LT Switchboards415V PCC, MCC, AMF DG Boards, APFC BanksIEC 61439-1 / IS 8623Busbar torque audit, 1000V Megger test, Shunt trip testsCalibrated Relay Certificates
Overhead Busduct & TraysSandwich Busways up to 4000A, HDG Ladder TraysIEC 61439-6 / IS 2062Phase insulation test, 86-micron HDG galvanizing checkBusbar Alignment & Route Map
Machine Feeder CablingXLPE Armoured Copper/Aluminium Cables, SDBsIS 7098 / IS 1255Insulation resistance (Megger), phase sequence checkCable Schedule & Ferrule Chart
Pneumatic UtilitiesAir Compressors, Dryers, Aluminum Ring MainISO 8573 Compressed Air24-hr pressure hold test, dew point hygrometer logPneumatic Schematic & Leak Log
Earthing & LightningChemical Pipe Earth Pits, Copper Strips, ESE MastIS 3043-2018 / IEEE 80Fall-of-potential test < 1.0 Ohm, strike radius testNumbered Earth Pit Test Logs
Milestone-Driven Execution

Our 5-Stage Plant Setup Roadmap

A proven turnkey lifecycle delivering on-schedule factory startups with zero safety incidents.

01

Load Sizing & Layout Review

Connected load calculations, machinery power demand matrices, civil layout evaluation, and DISCOM power sanction planning.

02

Detailed Engineering & SLD

CAD Single Line Diagram (SLD) creation, cable sizing schedules, panel layout drafting, and submission to statutory CEIG authorities.

03

Substation & Heavy Power

Erection of 11kV/33kV substations, power transformers, main PCC switchboards, earthing grids, and overhead sandwich busducts.

04

Machine Drops & Utilities

Installation of machine sub-distribution boards, localized isolators, production bay lighting, and compressed air utility ring mains.

05

Testing, CEIG & Power On

Pre-commissioning Megger/Hi-Pot tests, CEIG inspectorate walk-through escorting, and official plant-wide power energization.

Project Management Clarifications

Frequently Asked Questions

Answers to common questions regarding greenfield and brownfield plant electrification.

What stages of new factory plant setup does Thibstas Industrial handle? +
We handle the entire electrical and utility lifecycle: initial load sanctioning and SLD drafting, 11kV/33kV substation erection, transformer and PCC panel installation, busduct routing, plant earthing grid creation, machine power drops, compressed air piping, high-bay lighting, and statutory CEIG approvals.
Can you execute plant expansions (brownfield projects) without interrupting ongoing production? +
Yes. For brownfield manufacturing expansions, we implement phased tie-ins, scheduled weekend busbar tap-offs, and isolated sub-distribution circuits, ensuring existing production lines operate at 100% capacity during construction.
How do you coordinate with civil contractors and machine OEMs during plant setup? +
Our project site managers coordinate directly with civil structural teams for cable trenching, transformer plinth sizing, and wall cutouts, while collaborating with machine OEMs to ensure exact electrical incoming ratings, isolator drops, and pneumatic supply parameters.
Do you provide liaison support for DISCOM power sanctions and CEIG clearances? +
Yes. We prepare the complete statutory engineering package: CAD Single Line Diagrams (SLDs), connected load schedules, protection relay calculation sheets, and earth resistance logs, walking your project through the Chief Electrical Inspectorate (CEIG) inspection to power energization.
What is the typical execution timeline for setting up electrical infrastructure for a new manufacturing facility? +
Standard greenfield plant setups typically span 45 to 90 days depending on the connected load capacity (e.g. 500kVA to 5MVA), switchgear procurement lead times, and civil building readiness. We provide a milestone-driven Gantt chart with weekly progress reports.

Planning a New Factory Setup or Plant Expansion?

Share your architectural layout, equipment machinery list, or Single Line Diagram (SLD). Our senior industrial project engineers will prepare a turnkey infrastructure proposal with milestone timelines.

Projects Lead: +91 9492829072 (Mr. Siva Sankar) | Supply Desk: +91 9390021173