Industrial AMC & Preventative Maintenance Support
Eliminate unexpected plant downtime, protect expensive electrical assets, and ensure complete regulatory compliance with scheduled preventative maintenance, infrared thermal scans, and rapid 24/7 breakdown support across South India.
Service & AMC Operations Desk
Direct access to our senior maintenance and service operations engineers.
Full-Spectrum Industrial Maintenance Coverage
From high-voltage switchyards to shopfloor motor controls, our certified technicians safeguard your facility with scheduled preventative maintenance and verified testing.
Substation & Transformer AMC
Complete maintenance of 11kV/33kV indoor and outdoor yards, transformer oil breakdown voltage (BDV) testing, silica gel replacement, and HT breaker mechanism servicing.
- Transformer oil filtration & moisture testing
- VCB/SF6 contact timing & trip mechanism lubrication
- Bushing cleaning, horn gap & surge arrester check
LT Switchboard & Busduct Servicing
Periodic maintenance of Power Control Centers (PCC), Motor Control Centers (MCC), and APFC panels to prevent dust build-up, contact degradation, and unexpected busbar flashovers.
- Air Circuit Breaker (ACB) contact servicing & racking
- Busbar joint torque audits with calibrated wrenches
- APFC capacitor bank health & power factor tuning
VFD & Motor Health Management
Preventative cleaning, drive diagnostic parameter reviews, cooling fan replacements, DC bus capacitor testing, and periodic motor insulation resistance logs.
- Drive heat sink cleaning with anti-static blowers
- Motor winding megger testing & phase resistance checks
- Bearing vibration analysis & lubrication checks
Infrared Thermography Audits
Scheduled live thermal imaging of all busbars, feeder breakers, cable joints, and motor junction boxes to locate thermal anomalies and loose connections before failures occur.
- High-resolution infrared thermal imaging scans
- Thermal gradient classification (Delta-T analysis)
- Actionable corrective rectification reports with photo logs
Earthing & Safety Relays
Quarterly earth pit resistance testing, chemical compound moisture replenishment, earth strip continuity checks, and primary/secondary relay trip verification.
- Earth pit resistance testing (< 1.0 Ohm compliance)
- Overcurrent, earth fault & under-voltage relay timing
- Statutory safety logbooks maintained for CEIG compliance
24/7 Emergency Breakdown Support
Priority escalation line and rapid dispatch of certified electrical technicians and replacement switchgear parts to restore plant power quickly during outages.
- 2 to 4-hour rapid mobilization SLA in industrial clusters
- Emergency temporary bypass and spare part stocking
- Root cause analysis (RCA) reporting post-incident
Annual Maintenance Contract (AMC) Tiers
Select the service level agreement that best fits your plant operational risk and internal maintenance resources.
| Service Scope & Inclusions | Standard Non-Comprehensive AMC | Semi-Comprehensive AMC | Full Comprehensive Turnkey AMC |
|---|---|---|---|
| Scheduled Preventative Visits | Monthly or Quarterly Scheduled PM | Monthly Scheduled PM + Emergency Visits | Bi-Weekly / Dedicated On-Site Stationing |
| Labor for Scheduled PM | ✓ Included | ✓ Included | ✓ Included |
| Emergency Breakdown Labor | ✓ Priority Dispatch | ✓ Unlimited Calls Included | ✓ 24/7 Dedicated Support Included |
| Routine Consumables & Minor Spares | — Billed on actuals | ✓ Fuses, lugs, sprays included | ✓ All routine contactors & spares included |
| Infrared Thermography Scans | Bi-Annually (2 Scans/Yr) | Quarterly (4 Scans/Yr) | Bi-Monthly + On-Demand |
| Earth Pit Resistance Testing | Annual Full Grid Test | Bi-Annual Grid Test | Quarterly + Chemical Replenishment |
| CEIG & Safety Compliance Audit Docket | ✓ Basic Log Provided | ✓ Certified Inspection Reports | ✓ Turnkey CEIG Liaison & Renewal |
| Emergency Mobilization SLA | Within 4 to 6 Hours | Within 2 to 4 Hours | Immediate / On-Site Technician |
Our Multi-Tiered Preventative Rhythm
A structured cadence of checks designed to catch equipment degradation months before failures occur.
Monthly Health Check
Monthly- Visual check of all MCC/PCC panel indicator lamps and meters
- Inspection of silica gel color in transformer breathers
- Check for abnormal humming, chattering, or ozone smell in switchgear
- Exhaust fan and filter status check on VFD and automation enclosures
- Immediate logging of any customer reported abnormal trips
Quarterly Comprehensive PM
Quarterly- Full infrared thermography survey on busbars and breaker contacts
- De-energized panel vacuuming with high-velocity antistatic equipment
- Torque tightness audit on all high-current power cables and busbar bolts
- Fall-of-potential resistance measurement of all plant earth pits
- Capacitor bank step-current check for APFC power factor penalty risk
Annual Shutdown Overhaul
Annual Shutdown- Transformer oil breakdown voltage (BDV) and acidity testing / filtration
- Complete Air Circuit Breaker (ACB) racking, contact dressing and arc chute check
- Insulation resistance (Megger) profiling across all main feeders and busducts
- Secondary current injection testing of numerical protection relays
- Compilation of the annual electrical safety docket for statutory authorities
Frequently Asked Questions
Answers to common procurement and maintenance management inquiries.
Protect Your Plant From Costly Unscheduled Downtime
Request a comprehensive facility walk-through and electrical asset audit. Our senior maintenance engineers will evaluate your panel conditions and provide a customized AMC contract proposal.