Supply Desk 9390021173
Get a Quote
Skip to content
Turnkey BoQ Procurement & Just-In-Time Site Logistics

Project Material Site Support & Procurement

Eliminate site delivery delays, fragmented vendor billing, and project execution bottlenecks with consolidated BoQ procurement, manufacturer-tested electrical materials, and phased Just-In-Time (JIT) site deliveries for contractors and factory builders.

Single-Vendor Billing Unified GST Reconciliation
100% MTC Certified OEM Routine Test Certificates
Phased JIT Staging Prevent Site Congestion & Theft
Cut-to-Length Cables Zero Field Scrap Wastage
Direct Project Supply Coordination

Procurement & Dispatch Desk

Connect directly with our procurement leads for instantaneous BoQ line-item pricing and dispatch dates.

Sales & Procurement Lead
Mr. Aditya Datta
+91 8143865751
General Works Coordination
Mr. Sai Teja
+91 9390021173
BoQ Review & Estimation
Submit Excel / PDF BoQ
sales@thibstas.com
Upload Project BoQ for Fast Quote →
End-to-End Supply Chain Support

Streamlined Procurement for Large-Scale Projects

We manage the complexities of sourcing, quality assurance, manufacturer testing, and phased job-site logistics so your project engineering teams can focus entirely on execution.

Consolidated BoQ Sourcing

Consolidating all electrical line items—cables, switchgear, cable trays, busducts, distribution boards, conduits, and accessories—under a single supplier agreement with unified GST billing.

  • Single commercial negotiation for 100+ line items
  • Direct OEM tier-1 pricing on Tier-1 brands
  • Unified logistics tracking and single-point accountability

100% Certified Test Reports (MTC)

Every dispatch arrives with manufacturer test certificates (MTC), routine test reports (RTR), and factory warranty dockets to satisfy client PMC and consultant requirements without friction.

  • Type-tested certificates for switchgear & busbars
  • Heat number and batch traceability for armoured cables
  • Third-party inspection agency (TPIA) facilitation

Phased Just-In-Time (JIT) Staging

Delivery scheduled to match site construction phases (Fix 1: brackets & trays; Fix 2: power cables & panels; Fix 3: wiring accessories), preventing site congestion, weather damage, and theft.

  • Delivery staggered to civil handover schedules
  • Zero on-site warehouse clutter and material deterioration
  • Protected weather-resistant packaging for outdoor drop-offs

Cut-to-Length Cable Supply

Cables supplied pre-cut to exact engineered drum lengths according to your approved site cable schedule. Eliminates expensive scrap copper/aluminium wastage and speeds up pulling times.

  • Custom drum winding labeled by feeder and tag ID
  • Elimination of on-site drum re-rolling & measuring errors
  • Reduced contractor scrap allowances from 8% down to < 2%

Fast-Track Shortage Dispatch

Emergency dispatch of last-minute BoQ additions, short-length cables, odd-sized lugs, heavy brass glands, and replacement breaker trip units from our regional warehouse within 24 hours.

  • 24-hour dispatch on critical electrical hardware shortages
  • Buffer inventory maintained across key industrial corridors
  • Zero idle site contractor labor due to missing components

Site Receiving & Joint Verification

Our logistical coordinators support your site engineers and storekeepers during unloading with structured physical packing slips, piece count verification, and certified delivery sign-offs.

  • Joint physical inspection at the project laydown yard
  • Material receiving report (MRR) documentation
  • Crane and forklift unloading coordination support
Product Lines & Brands

Project Material Sourcing Matrix

Comprehensive coverage across all electrical, utility, and hardware packages.

Material PackageTechnical Specifications & StandardsApproved Brands & Makes HandledQuality DocumentationProject Phase
HT & LT Armoured Cables1.1kV to 33kV XLPE/PVC, Aluminium & Copper, ArmouredPolycab, Havells, KEI, Finolex, Apar, UniversalIS 7098 / IS 1554 / MTCPhase 2 (Cabling)
Cable Trays & SupportsPerforated & Ladder type, Hot Dip Galvanized (HDG), Powder CoatedStandard IS 2062 Grade Steel, Custom EngineeredGalvanizing 86 Micron TestPhase 1 (Containment)
Switchgear & BreakersAir Circuit Breakers (ACB), MCCB, MCB, Contactors, Overload RelaysSchneider, Siemens, ABB, L&T, LegrandIEC 60947 Type Test CertPhase 2 (Panels)
Earthing & LightningChemical Copper-Bonded Rods, GI/Copper Strips, ESE ArrestersIS 3043 Compliant, UL Listed, Tested CompoundCPRI Tested < 1 Ohm CertPhase 1 (Civil / Grid)
Wiring Accessories & HardwareDouble compression brass glands, copper crimping lugs, terminal blocksDowells, Comet, Raychem, Phoenix Contact, WagoBatch Test & Plating CertPhase 3 (Termination)
Plant High Bay LightingHigh Bay LED 100W–250W, IP66, Cleanroom Teardrop, Flameproof (FLP)Philips, Wipro, Crompton, Bajaj, Sudhir FLPLM-79 / LM-80 / FLP CertPhase 3 (Finishing)
Structured Procurement Process

Our 4-Stage Project Delivery Workflow

A transparent procurement cycle that eliminates surprises, cost overruns, and site idle time.

01

BoQ Review & Optimization

Line-item engineering audit of your bill of quantities to cross-check cable sizing, tray loading capacities, and specify approved vendor lists (AVL).

02

Consolidated Commercial Bid

Transparent single-source commercial proposal featuring tier-1 OEM pricing, milestone-linked billing terms, and fixed delivery commitments.

03

Phased Staging & QA Inspection

Staged production, factory routine testing, MTC document compilation, and palletized packing customized for rapid job-site offloading.

04

Site Handover & Reconciliation

Direct delivery to your project laydown area, joint piece-count verification, signed delivery challans, and final BoQ quantity reconciliation.

Commercial & Logistical Details

Frequently Asked Questions

Common questions from project directors, procurement heads, and EPC contracts managers.

How does BoQ consolidation through Thibstas Industrial benefit EPC contractors? +
Instead of managing 30 to 50 separate vendors for cables, switchgear, cable trays, earthing hardware, and conduits, contractors work with a single dedicated point of contact. This provides unified volume pricing, single-invoice GST reconciliation, and synchronized site delivery timelines.
Are manufacturer test certificates (MTC) and quality reports provided with materials? +
Yes. 100% of our dispatches include OEM routine test certificates (RTR), manufacturer test certificates (MTC), warranty cards, and compliance documentation required for client PMC and third-party inspection agency (TPIA) approvals.
Can you phase material deliveries to match our site construction progress? +
Yes. We operate on a Just-In-Time (JIT) delivery schedule aligned with your site civil milestones (First Fix: GI trays, brackets, earthing; Second Fix: panels, cables; Third Fix: wiring accessories and fixtures) to avoid on-site congestion, weathering, and theft risks.
Do you provide cut-to-length cable delivery to avoid on-site wastage? +
Yes. Based on your approved site cable schedule, we supply cables pre-cut to specified drum lengths, minimizing scrap copper/aluminium wastage, eliminating field measuring errors, and reducing cable pulling labor hours.
What are your delivery timelines for emergency shortage requirements? +
For ongoing project contracts, we maintain strategic buffer stocks in our Hyderabad regional distribution hubs. Critical shortage items (odd-size lugs, glands, terminal blocks, replacement circuit breakers) can be dispatched to project sites within 24 hours.

Need Streamlined Material Supply for an Upcoming Project?

Send us your Bill of Quantities (BoQ) in Excel or PDF format. Our procurement and project logistics engineers will deliver an itemized quotation with guaranteed delivery schedules.

Procurement Lead: +91 8143865751 (Mr. Aditya Datta) | Desk: +91 9390021173